The process of insulation removal/replacement and large scale abatement projects, depends heavily upon strict disciplines for scaffold requirements. Proper system erection/dismantling and custom safety design, combined with our proven Versa Light Planking system can improve site safety and efficiency; resulting in large savings to your overall project labour costs and timing. Crossby Dewar Inc. has the experience required to provide safe and efficient access for major nuclear projects. We have qualified trainers on staff for basic and advanced scaffold certification. We also have a Professional Engineer for design and inspection as required by OSHA standards, as well as to manage our monthly scaffold inspection program.

  • Aluminum plank and toe boards
  • Fall arrest systems, CD Policy on Fall Arrest which exceeds the OHSA standards
  • Suspended scaffold systems
  • Use of safety gates and ladder cages to provide safe and easy access and aggress from working platform
  • All planking tie-down, using versa light fastening system to secure all scaffold planks
  • Seismically qualified
  • Tube and clamp scaffolding, modular systems and enclosures

Engineering and Inspection:

  • Certified Png. for design and approval
  • Qualified competent workers for inspection of all scaffolds
  • Scaffold tags and logs
  • Scaffold tracking systems

 

 

 

 